Offshore Wind Power Development In Taichung Port
The goal of offshore wind power capacity by 2025 will be 5.7GW (Demonstration phase included).
In Taichung port, the scope of offshore wind power development is:
1.Turbine pre-assembly area:
(1)No.1 pre-assembly area: #5A,#5B heavy wharf and the hinterland of wharf #5A,#5B,#4C(around 23.1ha)
(2)No.2 pre-assembly area: #36%(30 m) heavy wharf and the hinterland (around 32ha)
(3)No.3 pre-assembly reserve area: #107 heavy wharf and the hinterland (around 10.7ha)
2.Localized turbine parts manufacturing area:
#106 heavy wharf, the hinterland of wharf #106 and Industrial Zone (II), total area is around 107.3ha.
3.GWO training center:
TIPC invited a number of leading offshore wind power enterprises to development a Joint Venture company to set up a GWO training center in Taichung Port. It was operated by the 4th September of 2019. The existing TIPC's Training Park(TIPA) is able to provide services of classrooms, meals, and accommodations for GWO participants as well as the technicians for wind farm construction and operation. The training categories including advanced wind power training customized training program, GWO BST & Refresh course.
4.O&M base
Offshore Wind Power Development in Taichung Port
Download the Offshore Wind Power Development in Taichung Port
Taichung Port offshore wind quay information
Item |
Description |
Construction schedule
(estimated) |
Wharf #5A and #5B |
· 406m in length
· Depth of water: -11m
· Heavy-bearing-capacity(Quayside):50 ton/m2
· with hinterland of 23.1ha (include hinterland of #5A、#5B、#4C) |
· Wharf #5A: Completed by the end of Y2019
· Wharf #5B: Completed by June in Y2020
|
Wharf #36%(30 m) |
· 4000m in length
· Depth of water: -16m
· Heavy-bearing-capacity(Quayside):20、40 ton/m2
· with hinterland of 32ha |
· Completed by the end of Y2020
|
Wharf #106 |
· 250m in length
· Depth of water: -13m
· Heavy-bearing-capacity(Quayside):10、40 ton/m2 |
· Completed by June in Y2020 |
Wharf #107 |
· 200m in length
· Depth of water: -13m
· Heavy-bearing-capacity(Quayside):10、40 ton/m2
· with hinterland of 10.7ha |
|
Construction of public road and facilities on Industrial Zone (Ⅱ) |
· South-north road: around 1,068m in length, East-west road: around 725m in length
· Roads are around 30m in width |
South-north road: Completed by the end of Y2020 |